A1 Slides

Turn Messy Site Logs into Boardroom-Ready HSE Dashboards Overnight.

For Project Directors & Safety Managers in KSA who need to visualize LTIs, NCRs, and Leading Indicators without the manual grind.

100% Confidential. All uploads are protected by our Standard NDA

Is Your Safety Data Buried in Excel?

You have 3,000 workers on site. You have daily TBTs, weekly inspections, and hourly observations. But your weekly report is just a screenshot of a spreadsheet pasted into PowerPoint.

The “Data Dump” creates three risks:

 

Risk Blindness

Critical trends (like a spike in Near Misses) are missed because the data is unreadable rows and columns.

Wasted Man-Hours

Your high-value HSE engineers spend 6 hours formatting slides instead of inspecting the site.

Client Perception

The Client (NEOM/Red Sea/Aramco) sees a messy report and assumes a messy site.

“If the Board can’t read the trend in 5 seconds, the report has failed.”

HSC Dashboard

We Don't Just Format Slides. We Visualize Safety Culture.

A1 Slides transforms raw site data into clear, actionable intelligence by 8:00 AM. We turn “Compliance Data” into “Decision Tools.”

01

The Scoreboard (Lagging Indicators)

Live tracking of Safe Man-Hours, TRI (Total Recordable Injuries), and LTI-Free Days. We make the “Zero Harm” goal visible.

02

The Pyramid (Safety Culture)

We visualize Heinrich’s Triangle dynamically. Show the relationship between Unsafe Acts, Near Misses, and LTIs to prove your culture is proactive, not reactive.

03

The Compliance Tracker (NCRs)

Don’t just list Non-Conformance Reports. We visualize the Closure Rate (Raised vs. Closed) to show the client you are closing loops, not just opening them.

04

The Hotspots (Risk Heat Maps)

We map incidents by Zone or Area. Show the Project Director exactly where the risk is concentrated (e.g., “Zone B Scaffolding”).

Built for KSA Mega-Projects.

We are not a generic design agency. We are specialists in the Saudi construction sector.

We Know the Standards

We understand the specific reporting mandates of NEOM, Red Sea Global, Qiddiya, and Saudi Aramco.

We Speak the Language

We know the difference between an LTI (Lost Time Injury), an MTC (Medical Treatment Case), and an RWC (Restricted Work Case). You don’t need to explain the acronyms to us.

We Work While You Sleep

Upload your raw Excel logs at the end of the shift. Wake up to a finished dashboard before your 8:00 AM toolbox talk.

Stop Reporting the News. Start Analyzing the Risk.

Don’t let your hard work get lost in a spreadsheet. Let us build you a dashboard that demands attention.

Offer: Send us your raw Excel log or your last Weekly Report. We will send you back a Free HSE Dashboard Pilot within 24 hours.

100% Confidential. All uploads are protected by our Standard NDA

Related post